Run a short access audit and confirm the named delivery point, authorised contact and key measurements in writing before booking anything. Do this and you sidestep the vast majority of delays. The non-negotiables are simple: a fixed delivery point, one authorised signatory, doorway and lift measurements, and a certificate of insurance where the building demands one. The sections below cover the checklist, booking steps and inspection procedures in full.
TL;DR:
- Conduct a thorough site access audit covering doorway widths, lift dimensions, corridor turns, ceiling heights, and external vehicle access before scheduling delivery.
- Clearly specify the delivery point, scope, and contact details in writing to prevent delays and miscommunication on the delivery day.
- Assign a single signatory and inspector in advance, and coordinate with property management for permits, insurance certificates, and lift bookings early.
- Photograph and inspect pallets upon delivery, record damages immediately, and label each pallet with its designated room or zone to avoid misplacement.
- Treat furniture delivery as a logistics project with one schedule, accountability, and a dedicated team to reduce common delays and mishaps.
Office furniture delivery access covers every physical and administrative gateway a delivery crew must clear between the kerb and the desk that needs assembling. That includes doorways, lifts, loading docks, security sign-in, and the paperwork that lets a driver into a building at all. Office managers rarely think about it until a wardrobe box gets stuck in a stairwell.
Getting this wrong is expensive. A driver turned away for lack of a certificate of insurance still bills for the failed attempt, and a desk that will not fit through a fire door has to go back on the van. The fix is unglamorous: measure everything, write it down, and share it before the van leaves the depot.
Doorway and route measurements to record:
External access to confirm:
A simple access audit prevents most delivery failures, and the guidance consistently comes back to the same point: measure the loading dock, the doorway, and the lift interior before you commit to a delivery date, not after.
Booking well is mostly about putting things in writing that people usually leave to a phone call. Get these into the purchase order or quote confirmation, not a follow-up email nobody reads.
Clear scope is the single biggest factor in whether a delivery finishes cleanly or turns into a punch list. If nobody has agreed whether the driver carries boxes past the lobby, someone will assume they do, and someone else will assume they don’t.
You do not need a surveyor for this. A tape measure, a phone camera and 30 minutes on site will catch nearly everything that trips up a delivery.
Measure clear doorway widths at every internal door on the route, the lift’s internal depth, width and door opening, corridor widths at tight turns, stair widths if there is no lift, and ceiling height near any low fittings. Photograph each pinch point and annotate the image with the measurement, then label rooms with simple codes (Room 2.1, Room 2.2) so the supplier’s paperwork matches your floor plan.
| What to measure | Record as | Watch for |
|---|---|---|
| Doorway clear width | mm, narrowest point | Frame protrusions, closers |
| Lift interior | depth × width × door opening, mm | Weight limit signage |
| Corridor at turns | mm width at the tightest angle | 90-degree bends |
| Ceiling height | mm along the route | Sprinklers, light fittings |
Where a measurement comes in under the safe minimum, flag it and ask the supplier whether partial disassembly solves it, rather than discovering the problem with a desk half through a doorway.
Plan staging space before the van arrives. As a rough guide, allow around 1.5 to 2 pallet positions per desk for inspection and unpacking room, and budget 15 to 25 minutes per pallet for unloading.
Pro Tip: Ask the supplier to label each pallet with a room or zone code before it leaves their depot. It costs nothing and it is the fastest way to stop a boardroom table ending up in the wrong wing of the building.
Property managers commonly withhold loading dock or freight lift access until an approved certificate of insurance naming the building as additional insured is on file, so start this conversation early rather than the week of delivery.
Coordinate with property management early and work backwards from the building’s own rules rather than assuming access will simply be granted on the day.
Decide who signs for delivery before the van arrives, not while the driver is waiting. Facility teams should agree an authorised signatory in writing, because incorrect acceptance by an untrained staff member can undermine a genuine damage claim later.
Treat a furniture order the way you would treat any other logistics project: one schedule, one RACI, one point of accountability. Most delays trace back to the same three gaps: nobody measured the lift, nobody named a signatory, or the COI arrived a day late. Furnitureforbusiness runs these checks as standard, so you can hand over coordination entirely if you would rather not chase carriers yourself.
— Furniture
Furnitureforbusiness removes the multi-vendor headache by running delivery, RAMS-ready crews and white-glove installation under one order, with free delivery to the UK mainland as standard rather than a surcharge you find out about later.

Bulk fulfilment for a 200-desk fit-out and a five-chair top-up run through the same accountable process: one team, one schedule, one point of contact on the day. For desks that need staging or partial disassembly to clear a lift, check the height-adjustable desk range or browse ergonomic seating that typically arrives ready-assembled. Before requesting a quote, have your site measurements, named delivery point and required assembly scope ready. It speeds up the quote and means the crew turns up knowing exactly what the job involves.
For deeper background on the standards referenced above, see risk assessments and method statements for office deliveries and the bulk furniture delivery guide covering measurement and staging benchmarks in more detail. Use the measurement table above as a copyable starting template for your own site audit.